Asbestos Surveys & Management Plans
If your building was built or refurbished before 2000, the Control of Asbestos Regulations 2012 place a legal duty on you to manage any asbestos-containing materials (ACMs) in it. We survey, sample, report and write the management plan that keeps you on the right side of that duty.
Management Surveys
Non-intrusive inspection and sampling to HSG264 standard to identify ACMs in normal occupation and use.
Refurbishment & Demolition Surveys
Intrusive, destructive-access surveys required before any refurbishment or demolition work begins.
Asbestos Management Plans
The written plan and register CAR 2012 requires every duty holder of a non-domestic building to hold and review.
Risk Assessment & Prioritisation
Material and priority assessments scoring condition, surface treatment and likelihood of disturbance.
Bulk Sample Analysis
UKAS-accredited laboratory analysis of suspect materials with turnaround times to suit your programme.
Reinspection & Register Updates
Periodic reinspection so your register stays current as materials age or areas are altered.
How the works run
- 1Instruction & scopeWe agree survey type, access arrangements and any occupied-area restrictions.
- 2Site inspectionTrained surveyors inspect, photograph and sample suspect materials by area.
- 3Laboratory analysisSamples are analysed by a UKAS-accredited laboratory for fibre type and content.
- 4Report & registerYou receive a HSG264-format report, floor plans and a prioritised asbestos register.
- 5Management planWe draft or update your written management plan and set a reinspection schedule.
The duty to manage under CAR 2012
Regulation 4 of the Control of Asbestos Regulations 2012 places a legal duty on the owner, landlord or facilities manager of any non-domestic premises to find out whether asbestos is present, record its location and condition, assess the risk, and put a written plan in place to manage that risk. Failure to do so is an offence prosecutable by the HSE, and it is the single most common finding in HSE inspections of commercial buildings. Our surveys and management plans are built to close that gap and give you a defensible paper trail.
Where asbestos surveys meet invasive weed work
On sites where we are already treating Japanese knotweed or other invasive species, ground disturbance for herbicide injection, root barrier installation or excavation can bring buried ACMs to the surface, particularly on former industrial or demolished sites. Where our weed control teams encounter suspect materials during ground works, we pause, isolate the area and bring in this consultancy service before any further disturbance, protecting you from an unplanned CAR 2012 breach.
Compliance & accreditation
For how we identify species, price surveys and stand behind our work, see our approach FAQ.
Book an asbestos survey
Tell us your building type and any planned works and we will scope the right survey and give you a fixed price.
