Guaranteed Removal

    Japanese Knotweed Excavation & Removal

    When a herbicide programme is too slow for your build or sale, excavation removes the rhizome outright. We dig, screen, bury or cart away under a written remediation method statement — with a 10-year insurance-backed guarantee on completion.

    Full Dig & Cart

    Complete rhizome excavation and removal to a licensed landfill under EWC 20 02 01.

    On-Site Burial Cell

    Encapsulated burial at depth where site space allows — far cheaper than off-site disposal.

    Root Barrier

    Vertical and horizontal geomembrane barriers to protect boundaries and foundations.

    Screening & Reuse

    Mechanical soil screening to reduce volumes and retain reusable material on site.

    Licensed Haulage

    Sheeted, dedicated loads with consignment notes for every movement.

    RMS & Guarantee

    Remediation method statement for planning, plus a 10-year insurance-backed guarantee.

    How the works run

    1. 1Survey & delineationWe map the stand and probe to establish rhizome extent, depth and proximity to structures.
    2. 2Remediation method statementA written RMS is produced for your local authority, lender or warranty provider.
    3. 3ExcavationRhizome-bearing soil is excavated under supervision, with clean and contaminated arisings kept separate.
    4. 4Disposal or encapsulationMaterial is buried in a lined cell, screened for reuse, or removed to a licensed landfill.
    5. 5Validation & guaranteePost-works validation, monitoring visits and issue of the insurance-backed guarantee.

    Excavation vs herbicide — which do you need?

    Herbicide treatment costs less and works well when you have two to three seasons and no groundworks planned. Excavation costs more up-front but clears the ground immediately, which is what a developer, a buyer in a chain or a lender under time pressure usually needs. Read our full comparison before deciding.

    What knotweed excavation costs

    On-site burial for a small domestic stand typically runs £4,000–£8,000. Dig-and-cart to a licensed landfill is usually £150–£250 per tonne once haulage and gate fees are included, which puts a modest garden stand around £8,000–£15,000. Root barrier installation alone commonly falls between £2,500 and £6,000. Every quote is fixed after survey.

    Compliance & accreditation

    Environment Agency EPA 1990 compliance
    Licensed hazardous/controlled waste disposal
    10-year insurance-backed guarantee available
    RICS-format survey reports for lenders
    £10m public liability insurance
    Written remediation method statements

    Need knotweed gone before you build?

    Send photographs and a location — we will survey, delineate the stand and quote a fixed excavation price.

    Frequently Asked Questions

    Survey Booking

    Book your invasive weed survey

    PCA-qualified surveyors, nationwide coverage and a 10-year insurance-backed guarantee. Tell us what you're dealing with and we'll call you back within 2 hours.

    £10M insurance-backed guarantee
    Surveys typically within 48 hours

    No obligation. We never share your details.