Commercial Waste Contracts
A single scheduled waste contract across one site or a national portfolio, with fixed collection days, transparent gate fees and a KPI report every quarter so you can prove the service is doing what you are paying for.
Scheduled Collections
Fixed-day general, mixed recycling and food waste collections sized to your actual generation rates.
Multi-Site Frameworks
One contract and one point of contact covering portfolios of retail, office or industrial sites nationally.
On-Demand & Seasonal Uplifts
Ad-hoc skip and bulk uplift bookings for peak trading periods or one-off clearances.
Segregation & Recycling Programmes
Dry mixed recycling, cardboard baling and food waste streams set up to lift recovery rates and cut landfill tax exposure.
KPI & Cost Reporting
Quarterly reporting on collection compliance, tonnage, recovery rate and cost per site against agreed targets.
Duty of Care Documentation
Transfer notes and a full audit trail supplied for every collection across every site on the framework.
How the works run
- 1Portfolio reviewWe assess current volumes, contracts and container provision across your sites.
- 2Framework designA collection schedule and pricing structure is built per site, or standardised across the portfolio.
- 3MobilisationContainers are placed, collection days confirmed and site contacts briefed before go-live.
- 4Live serviceCollections run to the published schedule with transfer notes issued for every lift.
- 5Quarterly reviewKPI reports are reviewed with you and the schedule adjusted as sites open, close or change use.
Why single-site pricing rarely suits a portfolio
Landlords and multi-site operators are frequently locked into a patchwork of legacy contracts inherited from different tenants or acquisitions, each priced separately with different container sizes, collection days and gate fees. Consolidating onto a single framework gives you one invoice, one escalation route when a bin is missed, and genuine leverage to negotiate rates based on total portfolio tonnage rather than each site negotiating alone. It also gives compliance and sustainability teams a single source of truth for reporting.
Segregation duties that apply from 2025
The Simpler Recycling reforms under the Environmental Protection Act 1990, in force for most businesses from 31 March 2025, require workplaces in England to separate dry recyclable materials, food waste and residual waste rather than mixing them into a single general waste stream, with limited exemptions for small businesses on food waste. Contracts that were compliant under the previous regime need reviewing, and we build container provision and collection frequency around these duties from the outset rather than retrofitting them later.
Compliance & accreditation
For how we identify species, price surveys and stand behind our work, see our approach FAQ.
Set up a commercial waste framework
Send us your site list and current contracts and we will return a consolidated proposal with KPI reporting.
