Construction Waste Disposal
Skips on a live construction site fill fast and get contaminated with mixed materials that could otherwise be recycled. We run site waste collection and segregation that keeps recovery rates up, keeps your site tidy, and keeps your Duty of Care paperwork in order.
Site Waste Collection
Skip and roll-on-roll-off collections scheduled around your build programme, not the other way round.
Waste Segregation
On-site segregation of timber, metal, plasterboard, inert rubble and general waste to maximise recycling.
Muck-Away
Removal of excavated soil and subsoil to licensed disposal or beneficial reuse sites, including material movement records.
Recovery Rate Reporting
Diversion-from-landfill figures for your site waste management plan or client sustainability reporting.
Site Waste Management Plans
SWMPs prepared or maintained for principal contractors who need one for client or planning conditions.
Duty of Care Documentation
Waste transfer notes for every load, filed and available for inspection at any point.
How the works run
- 1Site assessmentWe look at your programme, access and expected waste volumes to plan the right collection mix.
- 2Container placementSkips or RoRo containers are positioned and labelled for the segregation scheme agreed.
- 3Scheduled collectionsContainers are swapped on a rolling schedule so waste never backs up your site.
- 4Processing & recoveryLoads go to licensed transfer stations for sorting, recycling and recovery ahead of any landfill.
- 5ReportingYou receive waste transfer notes and, on request, a recovery rate summary for your records.
Where knotweed and site clearance overlap
Redevelopment sites with a history of Japanese knotweed, giant hogweed or other invasive species need their arisings and any contaminated soil kept entirely separate from general construction waste. Mixing rhizome-bearing soil into a general muck-away load risks spreading the plant to the receiving site and is itself a Duty of Care breach — controlled waste containing viable knotweed must be consigned to a facility licensed to accept it. Where we are already treating an invasive species on your site, we plan the segregation and disposal route for that material before groundworks start, alongside your ordinary construction waste stream.
Keeping recovery rates up
Most planning conditions and client contracts now expect a minimum percentage of construction waste diverted from landfill, often 90% or higher for demolition projects. That target is only achievable with disciplined segregation at source — timber, metal, plasterboard and inert rubble kept apart rather than binned together — because once materials are mixed in a general skip, recovery becomes far harder and more expensive at the transfer station.
Compliance & accreditation
For how we identify species, price surveys and stand behind our work, see our approach FAQ.
Set up a site waste collection schedule
Send us your site details and programme and we will propose a segregation scheme and fixed collection pricing.
